Documentation for the release of Stade Nuclear Power Plant buildings
Übersicht
PreussenElektraGmbH commissioned VPC GmbH with a project for the preparation of the documentation, which is a fundamental prerequisite both for the release and for the handover of buildings and terrain in the supervised area of the Stade Nuclear Power Plant (KKS). The documentation meets the requirements set out in Section 7(3) of the German Atomic Energy Act (AtG) and the corresponding requirements set out in the Radiation Protection Ordinance (StrSchV) and in DIN 25457. The requirements set out by the Ministry of the Environment in the KKS-specific approval notice are satisfied in the documentation.
The documentation created by VPC enables PreussenElektrato efficiently apply to the authorities for demolition of the building and site release. It thus makes an important contribution to the further dismantling of the KKS.
Services of VPC at a glance