Documentation on building clearance at the Stade nuclear power plant
Start / Referenzen / Documentation on building clearance at the Stade nuclear power plant
Overview
Customer
PreussenElektra GmbH
Location
Deutschland 21680 Stade
Duration
2019
PreussenElektraGmbH commissioned Dornier Nuclear Services with a project for the preparation of the documentation, which is a fundamental prerequisite both for the release and for the handover of buildings and terrain in the supervised area of the Stade Nuclear Power Plant (KKS). The documentation meets the requirements set out in Section 7(3) of the German Atomic Energy Act (AtG) and the corresponding requirements set out in the Radiation Protection Ordinance (StrSchV) and in DIN 25457. The requirements set out by the Ministry of the Environment in the KKS-specific approval notice are satisfied in the documentation.
The documentation created by Dornier Nuclear Services enables PreussenElektrato efficiently apply to the authorities for demolition of the building and site release. It thus makes an important contribution to the further dismantling of the KKS.
Services of Dornier Nuclear Services at a glance
Preparation of a handover program as a concept for a general approach
Surveying of the operating history of buildings in the supervised area of the KKS, followed by a plausibility analysis
Stocktaking of mobile and stationary facilities
Preparation of the associated measurement and sampling program for the interior of the buildings and the building envelopes, delimitation of potential accumulation points
Coordination of interfaces with adjacent decommissioning activities