Planning and optimization of the residual material processing center (RBZ) for the dismantling materials from deconstruction
Start / Referenzen / Planning and optimization of the residual material processing center (RBZ) for the dismantling materials from deconstruction
Overview
Customer
PreussenElektra GmbH
Location
Germany Grohnde
Duration
2020 - 2025
Our services in detail:
Evaluation of the existing and planned facilities for the RBZ for further usability in dismantling for the Grohnde nuclear power plant
Determination and validation of the mass flows for the dismantling masses for the design of the RBZ facilities with regard to the required processing capacities
Development of a space utilization concept for the processing of residual materials in dismantling and optimization of the installation locations of the RBZ facilities incl. evaluation and comparison of different variants Development of the logistics concept Evaluation and comparison of different variants to be developed
Development of the logistics concept
Determination, preparation and preparation of the technical approval requirements for the construction and operation of the RBZ
Development of the time specifications for planning, procurement and commissioning of the residual waste processing center, and commissioning of the residue processing center and monitoring of the developed schedule
Checking the processes for completeness and efficiency
Creation of a capacity utilization plan for the workstations of the RBZ and evaluation of the required buffer spaces
Identification of the need for action and potential for optimization
Creation of service descriptions for the procurement of the workstations
Customer support for the procurement and installation of the technical equipment used in the RBZ until commissioning
Coordination of interfaces for the construction and operation of the RBZ facilities
Planning of administrative measures for special projects in the RBZ