Concept development and operational implementation of a process for checking and, if necessary, reconfiguring around 30,000 residual material containers at the KKP site
Start / Referenzen / Concept development and operational implementation of a process for checking and, if necessary, reconfiguring around 30,000 residual material containers at the KKP site
Overview
Customer
EnBW Kernkraft GmbH
Location
Germany Philippsburg
Duration
2023 - 2024
Our services in detail:
Reviewing the instructions and identifying the necessary measures
Reviewing the conditions on site and creating a list of the delta between the requirements and the actual conditions
Describing the processes required to close the delta between the requirements and the actual conditions
Planning and describing the processes in a level of detail appropriate for operational implementation
Determining the throughput and capacity utilization of the individual process steps for the processing of around 30,000 containers
Determining scenarios for various target variables and their influence on the process design. The scenarios include
– Shortest possible duration for carrying out the process for all containers
– most economical scenario
– most flexible scenario to take into account new findings on the required processing
Design and implementation of training courses for operational staff on processing and documenting residual materials