Process analysis and implementation support for the inspection and, if necessary, reconfiguration of around 5,000 waste containers
Start / Referenzen / Process analysis and implementation support for the inspection and, if necessary, reconfiguration of around 5,000 waste containers
Overview
Customer
EnBW Kernkraft GmbH
Location
Germany Neckarwestheim
Duration
2024
Our services in detail:
Examination of the conditions on site
Identification of the measures required to check and, if necessary, reconfigure the existing containers
Planning of the processes required to process the existing containers
Description of the processes in a level of detail appropriate for operational implementation
Determination of throughput and capacity utilization of the individual process steps for processing the approx. 5,000 existing containers. 000 existing containers
Review of the existing machine technology for suitability for the required throughputs and processes and, if necessary, rough proposals for adaptation measures for the machinery
Determination of scenarios for various target variables (e.g. post-processing location, time slots, machinery (existing), personnel requirements, costs and expected risks and opportunities) and their influence on the process design.
Design and implementation of training courses for operational staff on waste processing and documentation