Due to the manufacturer’s giving notice of discontinuation of theold control system, the I&C system for 2 furnace lines and the common systems was replaced. At the same time, black box controls were mapped transparently and integrated into the I&C system and the control room was modernized.
Services of VPC at a glance
Development of rough and detailed concepts / time schedule
Compilation of quantity structures
Preparation of the technical inquiry specification, incl. bid specifications
Preparation of contract award
Assistance in contract awarding
Site supervision (construction supervision) and documentation