Engineering services for the dismantling of the Lippendorf and Thierbach Power Plants
Overview
Within the scope of this project, old power plant installations at the Vattenfall sites Lippendorfand Thierbachwere dismantled. At the Lippendorfsite, the scope included the dismantling of the boiler house with 7 steam generators (4x330t/h, 3x420t/h), the power house with 8 turbines (3x100MW, 4x50MW), the bunker bay, the cooling towers (113m), the chimney (300m), the coal handling and ash removal facilities, and the ancillary plants of the old power plant. At the Thierbachsite, the following plant parts were dismantled: boiler house (4 steam generators), power house (4 turbines), bunker bay, 4 cooling towers, chimney, coal handling and ash removal facilities, and the ancillary plants of the old power plant.
Services of Dornier Power and Heat at a glance