Start / Referenzen / Noise protection studies for transformer stations
Overview
Customer
Christburk Grundbesitz GmbH
Location
Germany 10118 Berlin
Duration
since 09/2014
A residential development is planned on the site of a former power station in northern Berlin. In the immediate vicinity of the northern section of the development, there are two transformer stations in operation, whose noise emissions have a considerable influence on the immissionguide values at the development site.
Within the scope of expert consultancy on noise issues, VPC carries out emission and immission measurements, defines and monitors the extensive noise control measures and provides support in addressing any acoustic issues.
Services of VPC at a glance
Carrying out sound measurements (emission and immission)
Modeling of plant components and sound propagation analysis
Definition of mitigation measures, supervision of implementation
Carrying out modal analyses on machine foundations
Installation of resonators and use of foundation reinforcements