Installation of activated carbon dosing systems at the Lippendorf Power Plant
Start / Referenzen / Installation of activated carbon dosing systems at the Lippendorf Power Plant
Overview
Customer
LEAG Lausitz Energie Kraftwerke AG
Location
Germany 04575 Neukieritzsch
Duration
01/2018 - 02/2019
In order to adapt the power plant units at the LippendorfPower Plant to the tightened requirements for compliance with the Hg emission limit values, activated carbon injection systems were installed at units R and S, for injection into the flue gas stream upstream of the electrostatic precipitator to reduce the mercury content in the flue gas.
VPC provided the complete engineering services for the installation of the activated carbon dosing plants up to the handover to the operator.
Services of VPC at a glance
Approval documents, preparation of the application for approval
Contract award planning
Detail engineering: Plant layout and construction planning, engineering services for plant and machinery systems, engineering services for electrical and I&C systems