Owner’s engineer for a brownfield new-build project at the CCGT CHP Plant Ljubljana
Start / Referenzen / Owner’s engineer for a brownfield new-build project at the CCGT CHP Plant Ljubljana
Overview
Customer
TE-TOL Ljubljana
Location
Slovenia 1000 Ljubljana
Duration
2012 – 2020
Installation of two gas turbines including heat recovery steam generators with a capacity of approx. 50 MW each. The new plant supplies the existing steam turbine and the district heating system with process steam.