Flexibilization and optimization of the operation mode of Unit Q of the Boxberg Power Plant
Start / Referenzen / Flexibilization and optimization of the operation mode of Unit Q of the Boxberg Power Plant
Overview
Customer
LEAG Lausitz Energie Kraftwerke AG
Location
Germany 02943 Boxberg
Duration
01/2018 - 10/2018
In order to enable more flexible deployment of Unit Q of the BoxbergPower Plant against the background of the current increasingly difficult market conditions, the optimization of the plant’s primary control power supply capabilities was started as part of the “SDL Optimization” project, which was divided into several phases. The aim of the project was to extend, both upwards and downwards, the load range in which system services can be provided.
Services of VPC at a glance
Evaluation and optimization of measures designed to optimize the operation mode of Unit Q
Development and implementation of test programs for unit optimization
Determination of measures for the optimization of the unit operation mode
Optimization of primary control power output of Unit Q
Data acquisition and compilation, and evaluation of test results
Development of a control concept for the auxiliary steam control valve LBG28