As planned, our customer was granted the preliminary operating permit for feeding into the medium-voltage grid by edis. This clears the way for further commissioning of the higher-level systems. The project manager of Stadtwerke Frankfurt/ Oder (Christian Mocker) thanked the planning team of VPC for the successful work.
The Business Line Energy & Environment (VPC) of the Dornier Group had been awarded the contract as general planner for the project Modernization of the combined heat and power plant Frankfurt/ Oder in May 2019. In addition to the process engineering integration of the CHP engines and a hot water heater into the district heating network, the project management, implementation planning and tendering for the electrical and I&C trades had to be carried out. In addition, the technical building equipment was planned.
With the modernization of the power plant site, Stadtwerke Frankfurt (Oder) is ensuring the environmentally friendly and economical supply of heat and electricity in the region.